000 034350000a22006250004500
999 _c117492
_d117492
003 CR-TuBCO
005 20230430064839.0
007 ta
008 151013b xxu||||| |||| 00| 0 eng d2003
024 _ahttp://hdl.handle.net/11554/5418
040 _aCR-TuBCO
_cCR-TuBCO
_bspa
041 0 _aspa
090 _aThesis
_bG216li
100 1 _970329
_aGarcía Azuero, Andrés F.
110 _aCATIE - Centro Agronómico Tropical de Investigación y Enseñanza
_cTurrialba, Costa Rica
_93977
245 1 0 _aLineamientos para la planificación de un bosque modelo en Costa Rica
246 3 _aPlanning guidelines for a model forest in Costa Rica
260 _aTurrialba (Costa Rica)
_c2003
_bCATIE
270 _aSan José, C.R.
300 _a135 páginas
_bIlustraciones. Tablas
502 _aTesis (M. Sc) -- CATIE, Turrialba (Costa Rica), 2003
504 _aReferencias de las páginas 109-115
520 _aEste estudio aporta lineamientos para la planificación de un bosque modelo en la cuenca del río Reventazón, Costa Rica, considerando los principios del enfoque ecosistémico de la Convención sobre Diversidad Biológica. Como resultados del componente de identificación y selección de actores sociales se obtuvo una propuesta de actores relevantes de la cuenca, así como opiniones y aportes acerca de la iniciativa, como sus fortalezas y debilidades, posibles estrategias para llevarla a cabo, una propuesta de conformación del grupo coordinador, y la identificación de vacíos en el proceso.
520 _aThe present study has developed planning guidelines for the establishment of a Model Forest in the Reventazón River watershed, Costa Rica, in line with the ecosystem approach principles established by the UN Convention on Biological Diversity. It is suggested that an educational campaign is developed from the outset to raise consciousness regarding improved management of natural resources and the initiative itself. This would also provide a forum to enable participation in the planning and decision making processes. A proposal was developed of the relevant stakeholders on the watershed level, and feedback on the initiative was received through the consultation process. The initiative's strengths and weaknesses, possible strategies in order to put the initiative into practice, a proposal for the establishment of the coordination group, and the identification of shortcomings in the process were some of the issues raised.
546 _aTesis en español con resumen en inglés
650 1 0 _aAGRICULTURA
_94
650 1 4 _9156626
_aORDENACION DE RECURSOS
650 1 4 _9158824
_aPLANIFICACION
650 1 4 _9155109
_aMODELOS
650 1 4 _9161988
_aRECURSOS NATURALES
650 1 4 _98
_aCONSERVACION DE LOS RECURSOS
650 1 4 _9139407
_aCARACTERISTICAS DEL SITIO
650 1 4 _92064
_aCOSTA RICA
690 _aFORESTS
_9148332
690 _aRESOURCE MANAGEMENT
_9162808
690 _aPLANNING
_9158877
690 _aMODELS
_9327554
690 _aNATURAL RESOURCES
_9155804
690 _aRESOURCE CONSERVATION
_9162807
690 _aSITE FACTORS
_9164939
691 _aTurrialba
856 _updf
_qhttp://hdl.handle.net/11554/3399
_yspa
901 _aK10
902 _aP01
903 _aE
903 _aU
903 _aV
903 _aZ
904 _aBCO
905 _aC
906 _a20040101
908 _aB
942 _cDIG
_2ddc