000 058860000a22005890004500
999 _c138219
_d138219
003 CR-TuBCO
005 20221110064317.0
007 ta
008 201215e2001 ||||| |||| 00| 0 spa d 2001
040 _aCR-TuBCO
_cCR-TuBCO
_bspa
041 0 _aspa
082 0 4 _aThesis V726cap
100 1 _9129309
_aVillatoro Granados, N.R.
110 _aCATIE - Centro Agronómico Tropical de Investigación y Enseñanza
_cTurrialba, Costa Rica
_93977
245 1 0 _aCapacidad institucional de siete municipalidades y su impacto en el manejo de los recursos naturales en la zona de influencia del Proyecto PAAR, Honduras
246 3 _aInstitucional capacity of seven municipalities and their impact in the natural resources management in the area under the Proyecto PAAR, Honduras
260 _aTurrialba (Costa Rica)
_c2001
_bCentro Agronómico Tropical de Investigación y Enseñanza (CATIE)
270 _aSan José, C.R.
300 _a202 p.
502 _aTesis (Mag. Sc.)--CATIE, Turrialba (Costa Rica), 2001
504 _a 36 ref.
520 _aEl presente trabajo se realizó bajo la metodología de estudio de caso y tuvo como objetivo principal evaluar la capacidad institucional y organizacional de las municipalidades y su desempeño en el manejo de los recursos naturales locales. Se seleccionaron siete municipalides de las 24 que se encuentran en la zona de influencia del Proyecto de Administración de Areas Rurales (PAAR), bajo el criterio del nivel de desarrollo municipal alcanzado por cada una de ellas. Considerando la gran variabilidad que existe entre las categorías de municipalidades seleccionadas, se esperó que esa variabilidad se manifestara en términos de mejores características organizacionales. Sin embargo, los resultados indican que la diferencia en el desarrollo alcanzado se debe más a un amplia disponibilidad de recursos que a una capacidad de gestión y captación de los mismos. Ninguna de las municipalidades cuenta con una historia de planificación estratégica. Tres municipalidades tienen planes de desarrollo municipal, pero en ellos no se incluyen los recursos naturales como uno de los ejes para su desarrollo. Los planes de manejo de recursos naturales que existen son elaborados por organizaciones ajenas al municipio. Las munipalidades, con respecto a variables organizacionales como misión, visión, desarrollo de personal, manejo de procesos organizacionales, no muestran mayor diferencia pues en todas se carece de ellas. En cuanto al uso y manejo de recursos naturales y medio ambiente, cinco municipalidades cuentan con Unidades Municipales Ambientales, tres de ellas tienen planes de manejo forestal, pero solo una lo ejecuta en forma debida. Solo una municipalidad cuenta con un plan de manejo de cuencas. En los otros municipios, los planes de manejo los elaboran y ejecutan instituciones de desarrollo local.
520 _aThe present work was carried out under the methodology of case study and it's main objective was to evaluate the institutional and organizational capacity of the municipalities and their performance in managing local natural resources. This pattern consists in evaluating the environment and the internal conditions of organization. Accordingly, seven municipalities were selected out of the 24 under the Rural Areas Administration Project (PAAR). Therefore, the municipalities were classified in four categories and two municipalities were selected from each category. Considering the different factors among the categories, it was expected that the results of this study were going to be expressed more in terms of better organizational characteristics. However, the results indicated that the difference between the developments reached by each municipality was more the result of the great variety of resources available, than to their capacity to manage them. None of the municipalities had historical data to support strategy planning. There municipalities had some type of plans for municipal development. However, these plans did not include the natural resources unless they were managed by an outside organization. With regard to organizational variables such as mission, vision, personnel development and managerial skills, there were not significant differences among them. As for use and management of natural resources and the environment, five municipalities had Environmental Municipal Units. Three of them had plans for forestal management. Furthermore, our case study indicated that only one municipality was carrying the plans as outlined. In addition, only one municipality was handling a plan for watershed management. In the rest of the municipalities, the plans were made and executed by developmental institutions at a local level. Three municipalities were managing the drinking water systems but with a different results among them. The territorial ordering was not included in the plans kept by any of the municipalities included in this study.
546 _atesis en español con resumen en inglés
650 1 4 _9143997
_aDESCENTRALIZACION
650 1 0 _aEVALUACIÓN
_92070
650 1 4 _9149186
_aGESTION
650 1 4 _9149475
_aGOBIERNO LOCAL
650 1 4 _aHONDURAS
_9150470
650 1 4 _9156626
_aORDENACION DE RECURSOS
650 1 4 _9161988
_aRECURSOS NATURALES
690 _aDECENTRALIZATION
_9143547
690 _aEVALUATION
_9147327
690 _aHONDURAS
_9150470
690 _aLOCAL GOVERNMENT
_9153280
690 _aMANAGEMENT
_9153726
690 _aNATURAL RESOURCES
_9155804
690 _aRESOURCE MANAGEMENT
_9162808
691 _aTurrialba
_xCRI
856 _uhttps://repositorio.catie.ac.cr/handle/11554/10142
_qpdf
_yspa
901 _aD10
902 _aP01
903 _aE
903 _aU
903 _aV
904 _aBCO
905 _aC
906 _a20020101
908 _aB
942 _cDIG
_2z